{"id":14248,"date":"2021-01-18T09:32:37","date_gmt":"2021-01-18T01:32:37","guid":{"rendered":"https:\/\/www.dev.articusfinance.com\/uncategorized-us\/development-finance-for-project-delayed-by-covid-19"},"modified":"2023-08-09T23:51:27","modified_gmt":"2023-08-09T15:51:27","slug":"development-finance-for-project-delayed-by-covid-19","status":"publish","type":"post","link":"https:\/\/backup.articusfinance.com\/us\/case-studies\/development-finance-for-project-delayed-by-covid-19","title":{"rendered":"Development finance for project delayed by Covid-19"},"content":{"rendered":"<p>When the pandemic hit, many developers with projects underway found themselves in difficult positions. From a lack of available raw materials to the practical constraints of building while social distancing, there were many barriers to progress. And many development finance lenders also became very cautious about proceeding \u2013 as this client discovered.<\/p>\n<p><!--more--><\/p>\n<h2 style=\"color: #134f5c; font-size: 15px;\"><strong>The client: <\/strong><\/h2>\n<p>In this case, our client had a part-built scheme which had encountered numerous delays due to Covid-19. Our client\u2019s existing lender wanted to exit the scheme and was not prepared to fund any further \u2013 which was preventing the client from completing the development.<\/p>\n<p>The site in question was valued in \u00a31.2 million, with planning for nine flats. With a total build cost of \u00a31.3 million \u2013 but an expected gross development value of over \u00a34 million \u2013 this client was understandably keen to complete the work, and therefore approached us after hearing about our experience finding solutions for complex development finance requests.<\/p>\n<p style=\"font-size: 15px;\"><span style=\"font-family: Verdana, Geneva, sans-serif; color: #134f5c;\"><strong><br \/>\nOur solution:\u00a0<\/strong><\/span><\/p>\n<p>While it\u2019s certainly the case that many have withdrawn from the market, we know there are still options available, providing you have the right relationships. By liaising with our network of industry contacts, we sourced suitable finance for the client at a very agreeable rate.<\/p>\n<p>This enabled the client to continue with the scheme, meaning that \u2013 despite the challenges posed by Covid \u2013 they can expect to enjoy a healthy profit from this project. This is a clear example of how, despite the difficulties at play in the market at present, having access to the right relationships can lead to a great outcome.<\/p>\n<p style=\"font-size: 15px;\"><span style=\"font-family: Verdana, Geneva, sans-serif; color: #134f5c;\"><strong><br \/>\nThe case in brief:\u00a0<\/strong><\/span><\/p>\n<ul>\n<li>Development finance for site with \u00a34 million GDV<\/li>\n<li>Build cost \u00a31.4 million<\/li>\n<li>Existing lender withdrawn from project<\/li>\n<li>New lender arranged<\/li>\n<\/ul>\n<p><em>From mainstream lenders to private offices, our unparalleled network of industry contacts means we can source finance for developments from across the market. Learn more about our <\/em><a href=\"\/us\/development-finance\"><em>development finance<\/em><\/a><em> offering here.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>When the pandemic hit, many developers with projects underway found themselves in difficult positions. From a lack of available raw materials to the practical constraints of building while social distancing, there were many barriers to progress. And many development finance lenders also became very cautious about proceeding \u2013 as this client discovered.<\/p>\n","protected":false},"author":1,"featured_media":14249,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[61],"tags":[],"class_list":["post-14248","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies"],"acf":[],"jetpack_featured_media_url":"https:\/\/backup.articusfinance.com\/wp-content\/uploads\/2023\/01\/development-finance-delayed-project.jpg","_links":{"self":[{"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/posts\/14248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/comments?post=14248"}],"version-history":[{"count":0,"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/posts\/14248\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/media\/14249"}],"wp:attachment":[{"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/media?parent=14248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/categories?post=14248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/backup.articusfinance.com\/us\/wp-json\/wp\/v2\/tags?post=14248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}